Hydraulic study slashes surge vessel size

The replacement surge vessel required for the sewage network in Bracknell was calculated at half the size of its 30-year

View item

Innovative valve delivers safer surge vessel inspections

• Dŵr Cymru Welsh Water rolls out PRV installations on surge vessels • QED’s innovative valve technology slashes inspection times • Surge systems can now

View item

Ten surge vessels installed for Southern Water

Quantum Engineering Developments (QED) completed installation in February 2015 of ten surge vessels for Southern Water to replace eight vessels

View item